Annual Street Construction Program

2018 Street Construction Project

During the construction season this year, 16 city streets will be reconstructed or restored. The work is funded by the Local Option Sales Tax. Reconstruction involves a total removal and replacement of the roadway, and underground utilities are replaced if needed. Often it requires closing sections of the road for two to three months. Restoration is typically an asphalt overlay, but could include fixing the curb or other smaller issues. Road closures for restoration are typically shorter or only partial closures.

West 4th Street (from Angie Drive to Hudson Road) and West 12th Street (from Clark Drive to College Street) will be our longer projects this year. West 4th Street construction will begin at Hudson Road and continue west to Chateau Court (Phase 1).  That section will be under a complete closure and is anticipated to be completed before the school year ends. When Phase 1 is complete, the contractor will continue west, closing the area from Chateau Court to Angie Drive (Phase 2) until August 2018. Phase 2 is planned to be reopened to traffic before school resumes. See image below.

Street Construction for Phase 1 and 2


Work on West 12th Street will begin at Clark Drive and continue east to Division Street (Phase 1). It will be closed until the school year ends. When Phase 1 is complete, the contractor will continue east from Division Street to Catherine Street (Phase 2). Phase 2 will include the intersections of Division Street and West 12th Street, and also
the intersection of West 12th Street and Catherine Street. This section will be under a complete closure until August 2018; it will reopen to traffic before school resumes. From September–November the contractor will work on the roadway from Catherine Street to College Street (Phase 3). See image below.

Street Construction for Phase 1, 2, and 3

Sign up for Project Update Notifications

Click here to sign up under Notify Me to receive project updates via email. Sign in with your email address, then select "Road Construction" from the list of options.

Other streets with construction this year are listed below.

Click on the street name link (if applicable) to see the most recent update.


Street Location Length
Feet Miles
W. 12th Street Clark Street to College Street   1,830  0.35
W. 4th Street (W) Angie Drive to Hudson Road   1,530  0.30
W. 4th Street (E) College Street to the East of the Railroad tracks   1,260  0.24
East Street Waterloo Rd to Grand Blvd.      410  0.08
Clearview Drive Valley High Drive to Primrose Drive   1,040  0.20
Veralta Drive Primrose Drive to Orchard Drive      600  0.11
https://www.cedarfalls.com/416/Iowa Street Seerley Blvd. to 22nd Street      580  0.10
 River Bluff Drive  Westwood Drive to Forrest Road      725  0.12
 Minnetonka Drive  2814 Minnetonka Drive to End of Loop   1,876  0.36
 EastPark Drive  Elmridge Drive to Briarwood Drive   1,575  0.30
 Briarwood Drive  Elmridge Drive to Eastpark Drive   1,575  0.30
 Chapman Court  Orchard Place to Cul De Sac      515  0.10
 Irving Street  Utility Parkway to Dead End      350  0.70
 Pheasant Drive  4th Street to the west 1600 feet   1,900 0.36 
 Hudson Road  UNI Skywalk to 600 feet North of 23rd Street   1,521  0.28
 Alley  Washington to Main Street - 4th Street to 5th Street      280  0.05
 Main Street  6th Street to Seerley Blvd   6,250  1.18
Total
25,363
 
 4.60